Tender and RFQ
Multiple subcontractors, identical technical content, comparable bids. The decision is recorded and the winner becomes a contract in one click.
ATMOS — Construction
Not another admin system: control over the tender, the site and the invoicing. On iPhone, iPad and Mac — in the office and at the foot of the scaffolding.



The ATMOS philosophy
Hungarianconstructionisn'tdecidedinanair-conditionedoffice.Thesitemanagerwadesthroughmud,theprojectmanagerchasesquotes,thesubcontractorwaitstogetpaid.ATMOSconnectsthewholechain—soabuildisn'tabattlefield,butclockwork.
The price matrix builds itself — the winner is one click.
The winning bid becomes a contract without retyping.
Request → price → approval → done. One chain, tied to the contract.
The certificate is the moment work turns into money.
Ten axes, one index — your entire shared history on a single radar.
Search returns records, not pages. The AI speaks human: “how much does Acél Kft. owe us?”

3 steps
and the tender is out

0
retyped data

3
money-flow types, one audit trail

2 days
instead of two weeks on paper

10
axes, one index

⌘K
one keystroke from anywhere
The price matrix builds itself — the winner is one click.

3 steps
and the tender is out
The winning bid becomes a contract without retyping.

0
retyped data
Request → price → approval → done. One chain, tied to the contract.

3
money-flow types, one audit trail
The certificate is the moment work turns into money.

2 days
instead of two weeks on paper
Ten axes, one index — your entire shared history on a single radar.

10
axes, one index
Search returns records, not pages. The AI speaks human: “how much does Acél Kft. owe us?”

⌘K
one keystroke from anywhere
You report it on site, the client approves it, and the system automatically pulls it into the next performance certificate. No items forgotten in a notebook, no year-end disputes — every piece of extra work leaves a trace, a price and an invoice.
Up close
Wizard, AI suggestions, price matrix — screen by screen.

Project + trade → subcontractors → send.
From the signed performance certificate, the official document and the invoice are generated on their own — with retention, advance recovery and reverse-charge VAT, exactly as the contract dictates. Meanwhile you're already on the next project.
Stargate — partner portal
One invitation e-mail, and your subcontractor works on their own clean interface — only their project, their tender, their certificates.
On your side you see the same thing, just with the full picture. No more e-mail attachments, no more “which version is the real one”.
Meet Stargate
The full toolkit
Project, tender, price comparison, contract, PC, variations, ticket, schedule, task, template, stock, asset, resource, partner, portal, search, AI, report, settings.
You don't have to use them all on day one. It's enough to know: when you need one, it's a click away.
Contracts, performance certificates, invoices, partners — one search box, with an AI assistant that answers from your own data. What takes others half an hour of digging through folders and emails, you find in five seconds.

QUESTIONS? ANSWERS.
Short answers for people about to decide.
Construction
A mid-sized general contractor runs eight to ten projects at once, with twenty to thirty subcontractors per project. Per subcontractor: a contract, amendments, performance certificates, deductions, retention and warranty obligations. That product runs into the thousands — and typically lives in a shared folder, a dozen spreadsheets and a few thousand e-mails. ATMOS keeps that chain in one place: project delivery works from the same data as finance, so nothing is entered twice.
It starts with the tender. Requests for quotation go out to the selected subcontractors, incoming bids are comparable against identical technical content, the decision and its rationale are recorded, and the winning bid becomes a contract in one click. Contracts are generated from parameterised templates — civil law, public procurement or reverse-charge VAT — versioned, and signable by magic link without paper.
The performance certificate is not a separate spreadsheet: it is built from contract line items, runs through the approval round, is generated and archived as a document once signed, and then becomes an invoice. Variations are settled on a separate track so they never blur into the contracted scope, while advance recovery and retention are part of the formula rather than someone’s memory.
Who is it for? Typically the general contractor who has outgrown spreadsheets: above three or four parallel projects, tracking contracts and certificates starts to live inside one person’s head, and that becomes an operational risk. Here a construction ERP is not a luxury — it is the reason summer holidays do not stop invoicing. Rollout is not a months-long project either: the core chain of tender, contract, certificate and invoice is in place from day one, because the system was built for it.
Multiple subcontractors, identical technical content, comparable bids. The decision is recorded and the winner becomes a contract in one click.
Documents generated from templates and versioned. Amendments, parties, deadlines, penalties and bank guarantees tracked in one place.
Certificates built from contract line items with an approval round. Automatic document generation and archiving on signature, with a timestamped trail.
Certificates become invoices. Variations settle on a separate track, with advance recovery and retention built in.
14 days free, cancel anytime. In 2 minutes you're inside the system, seeing your company's processes come alive.